Cement Shoes

Today the guys poured concrete into the four holes where the Lincoln Logs had been, thus completing the foundation. Following is a picture of each hole, each at a different level of completion.

Here’s Hole Number One — let’s call it Northeast Pit, shall we? — shortly after the concrete got dumped in. I know it’s really hard work, but seeing all that fresh goop made me want to jump in and schlomp around and build little concrete drip-castles and stuff.

In Hole Number Two (widely known as Southeast Sink) the cement has been tamed and groomed a little:

Here’s Dan smoothing and leveling Southwest Depression:

And finally, this is Northwest Gap in all its polished, filled-in glory: